2011/12/22

 

 

 

 

2011/12/22

 

 

 

2011/09/02

Holiday Notice For the 2012 Spring Festival, we arrange as follows:

Jan, 21(Saturday)                            Open

Jan,22(Sunday)~Jan,28(Saturday)             Close, totally 7 days

Jan,29(Sunday)~                             Open

 

Holiday Notice For the 2012 New Years Day, we arrange as follows:

Jan,1(Sunday)~Jan,3(Tuesday)              Close, totally 3 days

Jan,4(Wednesday)~                         Open

 

Holiday Notice of National Day
Oct,1
Oct,7 Close,
Oct
,8 Open

2011/09/02

Holiday Notice of Mid-Autumn Festival
Sep,10
Sep,12 Close,
Sep
,13 Open

2011/05/17

Holiday Notice of  2011 The Dragon Boat Festival, we arrange as follows:

June,4(Saturday)June,6(Monday)          Close, totally 3 days

June,7(Tuesday)                        Open

We apologize for any inconvenience during the holiday!

2011/04/12

Holiday Notice of  2011 International Labor Day
Apr,
30(Saturday)May,2(Monday)    Close,totally 3 days
May,
3(Tuesday)                           Open

2011/03/17

Holiday Notice For the 2010 Tomb Sweeping Day, we arrange as follows:

Apr,3(Sunday)Apr,5(Tuesday)    Close,totally 3 days
Apr,2 (Saturday )
  Open 

2010/12/15

Holiday Notice For the 2010 Spring Festival, we arrange as follows:

Feb,2(Wednesday)Feb,8 (Tuesday) Close, totally 7 days

Jan, 30  Feb,9  Feb,12 Open

2010/12/15

Holiday Notice For the 2011 New Years Day, we arrange as follows:

Jan,1(Saturday)Jan,3(Monday) Close, totally 3 days

Jan,4(Tuesday) Open

2010/05/28

Holiday Notice of  2010 The Dragon Boat Festival, we arrange as follows:
June,12 (Saturday)
June,13(Sunday)        Open

June,14(Monday)June,16(Tuesday)          Close, totally 3 days

June,17(Thursday)                        Open

We apologize for any inconvenience during the holiday!

 

2010/04/21

Holiday Notice of  2010 International Labor Day
May,1(Sunday)
May,3(Monday)    Close,totally 3 days
May,4(Tuesday)
                           Open

 

 

2010/03/09

Holiday Notice of  2010 Tomb Sweeping Day
Apr,3(Saturday)
Apr,5(Monday)    Close,totally 3 days
Apr,6(Tuesday)
                            Open                               

 

 

 

 

2010/01/12

Holiday Notice of  2010 Spring Festival
Feb,13(Saturday)
——Feb,19(Friday)    Close,totally 7 days
Feb,20(Saturday)
——Feb,21(Sunday) Open

 

 

2009/12/21

Holiday Notice of  2010 New Years Day
Jan,1(Friday)
——Jan,3(Sunday)           Close
Jan,3(Monday)
Open

 

 

2009/08/25

Holiday Notice of National DayMid-Autumn Festival
Oct,1
Oct,8 Close,
Sep
27 Sunday Open
10
Oct10Saturday Open

 

 

2009/05/29

A new generation container desiccant DryMax MX500Gcomes in beingEffect upgrades 70%Size decreases massly20% cost down

 

 

2009/04/29

April,29th,2009    Nantong OhE Chemicals Co., Ltd. has been classified as the MostExcellent Supplier by TBS HONG KONG LTD. We will keep up the good workand try our best to meet the needs of the customer.

 

 

2009/04/15

April,15th,2009 There is no DMF contained in our silica gel desiccant.The silica gel desiccant of our company has been tested by SGS ,it can meet the limitation requirement for Dimethyl fumarate(DMF) of the latest EU comission decision 2009/251/EC.

 

 

2009/04/10

April,10th,2009 Correspond to REACH
The desiccant of Nantong OhE Chemicals Co.,Ltd. can correspond to REACH.

 

 

2009/03/20

Holiday notice for Tomb-sweeping Day
From Apr., 4th , 2009 (Sat.)to Apr., 6th, 2009(Mon.), we will be on Tomb-sweeping Day holiday, and reopen in Apr., 7th, 2009.

 

 

2008//09/22

Notice for National Day
From Sep., 28th , 2008 (Mon.)to Oct., 5th. (Sun.), 2008, we will be on National Day holiday,and reopen in Oct., 6th, 2008.

 

 

2008/09/30

(Forenotice) Plan to sell high performance desiccant DryMax-M
At the relative humidity that with the effect of rust-proof, the moisture-absorption capacity of DryMax-M is 5 times of silica gel, so it can keep the inside of the package at a low moisture condition for a long time.
The bale packaging cost will be reduced because the dimension of the desiccant will be smaller. Different from physical adsorption desiccant, DryMax-M has the following properties: not release moisture again,
……, etc.
(click here for the details)

 

 

2008/08/01

Notice for Mid-autumn festival holiday .
The company will be on holiday from Sep. 13th(Friday) to Sep. 15th(Monday)

 

 

2008/05/31

We greeted the 13th anniversary of opening.
Thanks for everyone
s help, our company has been operated for 13 years since the opening in May, 1995.
We will still strive to be the useful company for all of our clients.

 

 

2008/05/13

Sutong Bridge opened
Taking the Yanjiang Expressway , we need only about 2 hours from our company to Shanghai (Pu xi). The traffic is more convenient than before
(click here for the details)

 

 

2008/04/01

The first HACCP(ISO22000) certified factory in this field began to be in construction.
(click here for the details)

 

 

2008/03/10

Exhibited in Shanghai International Desiccant Exhibition
(click here for the details)

 

 

2008/02/01

The packaging materials of lime desiccant and silica gel desiccant(SFseries)began to be changed into that impored from japan.
The yoshino paper and claf composited packaging material that imported from Japan is with the following good characteristics:
Using the new strengthened fiber(claf 25g/m2).Comparing with the goods before, the physical parameters, such as rupture strength, are promoted a lot.
Not containing the harmful substance( RoHS 6 substance etc.).
The printing ink is decomposed from natural material and not contains toluene, so it conforms to the standard of food, additive ,etc. (Notice 370 of Japanese Ministry of  Health).
After waterproof processing, it is with good waterproof property, so the danger of heat-releasing is reduced.
Using the special ventilating technology that imported from Japan, we only perforate in polyethylene layer. The holes in every square meter are as many as 80,000. So we can provide the desiccants with the best moisture-permeability property to the clients.